next up previous
Next: About this document Up: A comparison between Operations Previous: Conclusion and Future

References

1
J. Adams, E. Balas, and D. Zawack: The shifting bottleneck procedure for job shop scheduling. Management Science, 34:391--401, 1988.

2
D. Applegate and W. Cook: A computational study of the Job Shop Scheduling Problem. ORSA Journal on Computing, 3(2):149--156, 1991.

3
H. Beck: Constraint monitoring in TOSCA. Technical Report 118, AIAI, University of Edinburgh, 1992. Also published in Working Papers of AAAI Spring Symposium: Practical Approaches to Planning and Scheduling; Stanford, March 1992.

4
H. Beck: The Management of Job-Shop Scheduling Constraints in TOSCA. Technical Report 121, AIAI, University of Edinburgh, 1993. Paper presented at NSF Dynamic Scheduling Workshop, Florida, Jan 1993.

5
G. Bel, E. Bensana, D. Dubois, J. Erschler, and P. Esquirol: A Knowledge-Based Approach to Industrial Job-Shop Scheduling. In A. Kusiak (ed.): Knowledge-Based Systems in Manufacturing, chapter 10, pages 207--246. Taylor & Francis, 1989.

6
E. Bensana, G. Bel, and D. Dubois: OPAL, a multi knowledge-based system for industrial job-shop scheduling. International Journal of Production Research, 26(5):795--815, 1988.

7
M. Boddy and T. L. Dean: Deliberation scheduling for problem solving in time constrained environments. Artificial Intelligence, 67(2):245--285, 1994.

8
A. Collinot, C. L. Pape, and G. Pinoteau: SONIA --- a knowledge-based scheduling system. Artificial Intelligence in Engineering, 5(2):86--94, 1988.

9
H. Fisher and G. L. Thompson: Probabilistic learning combinations of local job-shop scheduling rules. In J. F. Muth and G. L. Thompson\ (eds.): Industrial Scheduling, pages 225--251. Prentice Hall, Englewood Cliffs, New Jersey, 1963.

10
M. S. Fox: Constraint-Directed Search: A Case Study of Job-Shop Scheduling. Research Notes in Artificial Intelligence. Morgan Kaufmann, Los Altos, California, 1. edition, 1987.

11
E. M. Goldratt and J. Cox: The Goal --- Excellence in Manufacturing. North River Press, 1992.

12
G. Hasle and S. F. Smith: Directing an Opportunistic Scheduler: An Empirical Investigation on Reactive Scenarios. In R. M. Kerr and E. Szelke (eds.): Preprints of Second International Workshop on Knowledge-Based Reactive Scheduling, pages 7--17, Computer and Automation Research Institute, Hungarican Academy of Sciences, Budapest, 1994.

13
S. Lawrence: Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques (Supplement). Graduate School of Industrial Administration, Carnegie-Mellon University, Pittsburgh, Pennsylvania, 1984.

14
H. Nadzeyka and B. Schnabel: Investigations on production lead times in mechanical engineering industries (in german). REFA-Nachrichten, 28(5):267--271, 1975.

15
M. Pinedo: Scheduling: Theory, Algorithms and Systems. Prentice Hall, 1995.

16
K. Poeck: Configurable problem-solving methods exemplified by the problem classes allocation and diagnostics (in german), volume 86 of DISKI. infix, Sankt Augustin, 1995.

17
K. Poeck and C. Hestermann: An intelligent interactive support system for short- and mid-term planning in production planning and control system. In N. M. Sadeh (ed.): Intelligent Manufacturing Systems, pages 285--288, 1995. Working Notes of the Workshop held at the 14th IJCAI-95, August 19.

18
K. Poeck and F. Puppe: COKE: Efficient Solving of Complex Assignment Problems with the Propose-and-exchange Method. In Proc. IEEE Conference on Tools with Artificial Intelligence, pages 136--143, 1992.

19
F. Puppe: Systematic Introduction to Expert Systems. Springer-Verlag, 1993.

20
N. Sadeh: Micro-Opportunistic Scheduling: The Micro-Boss Factory Scheduler. In [24], chapter 4, pages 99--137.

21
S. F. Smith: A Constraint-Based Framework for Reactive Management of Factory Schedules. In M. D. Oliff (ed.): Intelligent Manufacturing, pages 113--130, Benjamin/Cummings, Menlo Park CA, 1987.

22
R. Storer, S. Wu, and R. Vaccari: New search spaces for sequencing instances with application to job shop scheduling. Management Science, 38:1495--1509, 1992.

23
E. Taillard: Benchmarks for basic scheduling problems. EJOR, 64:278--285, 1993.

24
M. Zweben and M. S. Fox (eds.): Intelligent Scheduling. Morgan Kaufmann Publishers, Inc., 1994.

25
M. S. Zweben, B. Daun, and M. Deale: Scheduling and Rescheduling with Iterative Repair. In [24], chapter 8, pages 241--255.



Christian Hestermann
Fri Dec 6 16:54:59 MET 1996